For consultants
Give technical advice once, in the context it belongs to.
See every question with the space, the current drawing and the discussion attached — issue a revision once, and keep what you advised on the record instead of repeating it across calls, chats and meetings.
Try it · pick a revision from the schedule
Explore DrawingsPlan · Kitchen 602.04Scale 1:50Clouded: changed in V9
- Project
- Aaranya Residences
- Drawing
- Kitchen Electrical Layout
- No.
- A-602-E-104
- Issued by
- Electrical Consultant
Revisions
The problem
Stop giving the same answer on three different threads.
Today
- 01A call from site about a clash
- 02A photo of the drawing on a chat
- 03Ask which revision they are looking at
- 04Ask which room it is
- 05Reply on whichever thread asked
- 06Repeat it in the meeting
- 07Explain it again a month later
In Space
- 01Open the question
- 02See the room, the sheet and the thread
- 03Advise once, on the record
Context
Don’t advise on a question you’ve only half seen.
A query that touches your sheet arrives with the room, the revision it was asked against, the work it affects and everything already said about it — including what you said in the meeting.
Try it · open the project context
Query · Q-014
Can the plumbing shaft be shifted 150 mm?
Raised by Plumbing Agency·Directed to Architect + PMC
This is usually all that arrives: a question, forwarded. No room, no sheet, no history.
- Where
- Aaranya Residences / Tower A / Floor 06 / Residence 602 / Kitchen
- Your sheet
- A-602-E-104 · V8
- Site task it touches
- Revise kitchen electrical pointsIn Progress
- Needed by
- Thursday’s pour
On the query
- Plumbing Agency·2 days ago
Shaft clashes with the counter run in 602. Can it move 150 mm east?
- PMC·Yesterday
Routing to the Architect. Needed before Thursday's pour.
- Architect·Today
Shift approved by 150 mm. Update the drawing before execution.
You, in the coordination meeting · Hindi
“Plumbing shaft 150 mm shift ho sakta hai, lekin drawing update karni padegi.”
The plumbing shaft can move 150 mm, but the drawing needs updating.
Electrical Consultant
Meetings
Know what you committed to before the meeting ends.
The architect said it in Gujarati. What reaches you is the task it became — assigned to you, dated, linked to the meeting — not a line to find in someone’s notes.
Try it · accept the task the meeting gave you
Architect · Gujarati
“Electrical consultant Friday sudhi revised kitchen layout issue kari deshe.”
Electrical consultant will issue the revised kitchen layout by Friday.
Suggested task · assigned to you
Revise kitchen electrical points
Due Friday · Kitchen · 602.04
After you issue
Your sheet reaches the site without being forwarded.
Kitchen · 602.04
- 01
Architect
Answers Q-014
- 02
Electrical Consultant
Reissues A-602-E-104 as V9
- 03
Electrical Agency
Works from V9
- 04
Everyone else
Sees V8 as superseded
Revise kitchen electrical points picks up the new sheet without anyone forwarding it.
The project remembers why your drawing changed.
“Why did the counter points move in V9?”
The answer is the project’s, not something you have to reconstruct from your sent items.
13 Sep·Query Q-014
Plumbing Agency flagged a clash with the kitchen counter.
13 Sep·Weekly Coordination Meeting
Electrical Consultant: The plumbing shaft can move 150 mm, but the drawing needs updating.
13 Sep·Architect response
Shift approved by 150 mm.
15 Sep·Drawing V9
Counter points reissued after the shaft shift was approved.
16 Sep·Site
Electrical Agency worked from V9.
For the consultant
Spend less time re-explaining advice and more time giving it.
You know
- Which questions touch your discipline
- Where on the project they sit
- Which revision everyone is working from
- What you committed to in a meeting
- Where your advice was recorded
- Who acted on it
Put your advice where the project can find it.
See how Space connects queries, drawings, meetings and spaces so consultants advise once and the whole project works from it.