Spaces

Every piece of work has a place.

Organise the project the way it is actually built — from buildings and floors down to residences, rooms and work areas — then keep the work happening there connected to that place.

Try it · pick another floor, residence or room

space.stagewise.app/projects/aaranya-residences/structure

Aaranya Residences › Spaces

Spaces

Project › Tower › Floor › Residence › Room

Kitchen

602.04
Latest drawingA-602-E-104 · V8

Everything happening here stays connected to this place.

Floor 06 → Residence 602 → Kitchen

Decides for this space

Client

03Open tasks
02Drawings
01Open query
01Decision

Electrical points under revision. Countertop awaiting client sign-off.

01The problem

Project information makes more sense when you know where it belongs.

Somewhere on the project

  • Revise the electrical points
  • The latest kitchen drawing
  • The plumbing shaft query
  • The countertop decision
  • Which tower?
  • Which floor?
  • Which unit?
  • Which room?

All four belong here

Aaranya Residences → Tower A → Floor 06 → Residence 602 → Kitchen

In Space, the location travels with the work.

02Contents

Everything happening here, together.

Selecting a physical space reveals the work associated with it.

Space·Kitchen

602.04

03
Open tasks
02
Drawings
01
Open query
01
Decision
  • TaskRevise kitchen electrical points
  • DrawingA-602-E-104 · V8 · Kitchen Electrical Layout
  • QueryCan the plumbing shaft be shifted 150 mm?
  • DecisionKitchen Countertop

03Trail

One place. The full trail.

Kitchen · 602.04

Follow one issue forward. The plumbing query is still open while A-602-E-104 stands at V8 — below, the same question is answered, coordinated, reissued as Drawing V9, and built.

The work changes. The place keeps the context together.

  1. 13 Sep·Query

    Plumbing Agency flagged a clash with the kitchen counter.

  2. 13 Sep·Architect response

    Shift approved by 150 mm.

  3. 13 Sep·Weekly Coordination Meeting

    The change and the drawing update were discussed.

  4. 15 Sep·Drawing V9

    Revised shaft position issued.

  5. 16 Sep·Task completed

    Plumbing team executed the revised location.

04Structure

Structure the project the way it is built.

01Project
Aaranya Residences
02Building / Tower
Tower A
03Floor
Floor 06
04Unit / Residence
Residence 602
05Room / Area
Kitchen
06Open space / Common area
Terrace · Lobby · Parking

Give every piece of work its place.

See how Space connects the physical project to the work, drawings, questions and decisions happening inside it.