For architects & PMCs
Stay on top of the project without chasing every person.
See the questions, drawings, decisions, tasks and meeting actions that need you — with the people and project context already attached.
Try it · open anything under “Needs you”
Aaranya Residences
Tower A · Residential
Blocked
1
Waiting on Architect response
Open tasks
5
6 total
Decisions
2
1 awaiting client
Open queries
1
Q-014 unanswered
Needs you · Architect3
The problem
You shouldn’t have to remember the whole project in your head.
- “Has the architect replied?”
- “Which drawing is current?”
- “Who owns this task?”
- “Did the client decide?”
- “What came out of yesterday's meeting?”
- “Why is this work blocked?”
Today
- 01Agency asks the PMC
- 02PMC messages the architect
- 03Architect replies privately
- 04PMC forwards the answer
- 05Agency acts
- 06Client asks what changed
In Space
- 01Agency raises a query
- 02Architect and PMC both see it
- 03The answer stays attached
- 04The task proceeds
- 05The project keeps the context
Your view
Same project. It leads with what needs you.
The architect is asked for answers; the PMC keeps the work moving. Switch roles and the same project reorders itself — including the overview above.
Viewing as
Questions needing design input, the drawings around them, and the decisions you are part of.
Aaranya Residences
Needs your attention
- QueryCan the plumbing shaft be shifted 150 mm?Needs your response
- DecisionLiving room flooringYour input requested
- DrawingKitchen Electrical LayoutCoordination required
- TaskRevise kitchen electrical pointsDue 16 Sep
- MeetingWeekly Coordination MeetingMinutes ready to review
- 02QueriesAwaiting your response
- 03DrawingsAwaiting review
- 02DecisionsYour input requested
- 04TasksAssigned to you
- Weekly Coordination MeetingTomorrow · 11:00 AM
Day to day
Everything you coordinate, in one project.
Answer the blocker where the work is happening.
The question arrives with the space, the people and the task it is holding up. Answer it once — and watch the task it was blocking move.
Try it · answer the query and watch the task
Aaranya Residences › Queries
Can the plumbing shaft be shifted 150 mm?
Q-014 · raised by Plumbing Agency
Discussion2
Plumbing Agency · 2 days ago
Shaft clashes with the counter run in 602. Can it move 150 mm east?
PMC · Yesterday
Routing to the Architect. Needed before Thursday's pour.
Meetings & AI
Leave the meeting with the follow-up already organised.
Everyone speaks naturally, in whatever language the room speaks. Space returns a transcript, a summary, the Minutes of Meeting and the work the discussion implied — for your team to review.
Try it · create the suggested task, or dismiss it
Aaranya Residences › Meetings
Weekly Coordination Meeting
13 Sep 2026 · hosted by PMC
Transcript4
- Architect · GujaratiElectrical consultant Friday sudhi revised kitchen layout issue kari deshe.Electrical consultant will issue the revised kitchen layout by Friday.
- PMC · EnglishLiving room flooring still needs client approval.
- Electrical Consultant · HindiPlumbing shaft 150 mm shift ho sakta hai, lekin drawing update karni padegi.The plumbing shaft can move 150 mm, but the drawing needs updating.
Summary
Kitchen electrical revision, living room flooring approval and the plumbing shaft shift were reviewed. Sofa selection for the living room is still open.
Suggested task
Revise kitchen electrical points
Electrical Consultant · due Friday · Kitchen · 602.04
Memory
You shouldn’t need to remember why.
“Why was the plumbing shaft shifted 150 mm?”
Space keeps the trail, so the project doesn’t depend on someone’s memory.
13 Sep·Query
Plumbing Agency flagged a clash with the kitchen counter.
13 Sep·Architect response
Shift approved by 150 mm.
13 Sep·Weekly Coordination Meeting
The change and the drawing update were discussed.
15 Sep·Drawing V9
Revised shaft position issued.
16 Sep·Task completed
Plumbing team executed the revised location.
For the architect
You see
- Questions needing design input
- Drawings in context
- Decisions needing participation
- Tasks requiring review
- Meeting actions tied back to the project
Spend less time reconstructing context before you can respond.
For the PMC / project manager
You see
- What is due
- What is blocked
- Who is responsible
- What is waiting on another party
- What came out of the last meeting
Coordinate the project without maintaining the whole status in your head.
One project instead of six coordination systems.
Aaranya Residences
One project record
Tasks
responsibility
Spaces
location
Drawings
revision
Queries
clarification
Decisions
outcome
Conversations
context
Meetings
follow-up
Not six systems
one project
Run coordination from one shared project.
See how Space gives architects and PMCs the context they need without turning every question, revision and follow-up into another message.