Drawings

Never let the site work from the wrong drawing.

Upload a new revision once. Your drawing register shows which drawing is current, while every earlier version stays available for reference.

Try it · open an older revision

space.stagewise.app/projects/aaranya-residences/docs

Aaranya Residences › Documents › Electrical

Kitchen Electrical Layout

A-602-E-104 · Kitchen 602.04

V9 · Current

What V9 changed

  • shifted · Counter outlets shifted with the revised counter run
  • relocated · Hob point recoordinated against the new shaft position

Revisions5

01The problem

One drawing. Five files. Which one is the site using?

  • Kitchen-Electrical-Final.dwg?
  • Kitchen-Electrical-Final-v2.dwg?
  • Kitchen-Electrical-Updated.dwg?
  • Kitchen-Electrical-Latest.dwg?
  • Kitchen-Electrical-Final-Final.dwg?

One sheet on the project

A-602-E-104V8Current

Kitchen Electrical Layout · issued by Electrical Consultant

The site should never have to guess.

02Work

Work from the drawing that is actually current.

Task

Kitchen · 602.04

Revise kitchen electrical points

In Progress

Electrical Agency · Rohan Mehta · Due 16 Sep

Query Q-014

Works from

A-602-E-104

  • V9Current15 Sep 2026
  • V8Superseded08 Sep 2026

The task points at the sheet. The sheet knows which revision is current.

03Cause

Know what caused the revision.

A revision is the end of a conversation, not the start of one. The team raises each of these against the same space as they go, so the chain is still there afterwards. The drawing stays connected to the reason it changed.

A-602-E-104·V9

15 Sep 2026

Counter points reissued after the shaft shift was approved.

  1. 13 Sep·Query

    Plumbing Agency flagged a clash with the kitchen counter.

  2. 13 Sep·Architect response

    Shift approved by 150 mm.

  3. 13 Sep·Weekly Coordination Meeting

    The change and the drawing update were discussed.

  4. 15 Sep·Drawing V9

    Revised shaft position issued.

  5. 16 Sep·Task completed

    Plumbing team executed the revised location.

04Connected

The drawing is part of the project. Not a file sitting beside it.

A-602-E-104·V9

Kitchen · 602.04

  1. SpaceKitchen · 602.04
  2. TaskRevise kitchen electrical points
  3. QueryCan the plumbing shaft be shifted 150 mm?Q-014
  4. DecisionThe change is recorded against the project.
  5. ConversationThe counter clash, as it was discussed.
  6. MeetingWeekly Coordination Meeting

Keep everyone on the current drawing.

See how Space keeps revisions, project context and the work around them connected.